SOUTH PARS OIL LAYER PROJECT
location: the Iranian sector of the Persian Gulf, approximately 100 km south-west of the Iranian coast.
Objective:Engineering Detail design
Consultant: Amid Engineering & Development Company
Client:Saff Offshore Industries Company
Project Duration : 6 Months
Work Progress Appraisal : 100%
* * *
Project Description
The South Pars Field is located in the Iranian sector of the Persian Gulf, approximately 100 km south-west of the Iranian coast.
The South Pars Oil Field Development will be executed in two phases; the First Phase will consist of up to 7 production wells and will utilize a dedicated Floating Production Facility (FPSO).
Individual flow lines will transport reservoir fluids from each Christmas tree to a production manifold on Wellhead Platform and then to an export riser and hence via sub sea pipeline to an FPSO, for stabilization, dewatering, desalting and finally to be exported via shuttle tankers.
The design wellhead platform capacity will be 44,000 BLPD. The analysis of the profiles results that the design capacity is given by the production foreseen in August 2008 and corresponding to:
-
Gas Rate: 801 Sm3/day (28,305 MSft3/day)
-
Liquid Rate: 44,000 BFPD (35,000 bbl of oil and 9,000 of water).
For this Phase, the project includes engineering, procurement, supply, construction, installation and commissioning, of the normally unmanned Wellhead Platform (WHP).
AMID scope of work is to perform detail design and procurement engineering services. These services will comprise of the following
-
Review and endorse of Jacket detail design documents
-
Review and completion of detail design of topsides
-
Preparation of material requisition, technical bid evaluation and vendor drawing review
|