Salman Oil and Gas Integrated Development Project
Petroiran Development Company (PEDCO) intends to further develop the Salman fields through execution of the Salman Oil and Gas Integrated Development Project. The Salman field is located some 144 km South of Lavan Island in Iranian waters of the Persian Gulf and straddles the Iran-Abu Dhabi border.
O.U. complex in Iranian waters of the Persian Gulf. The Salman Oil and Gas field Integrated Development project has been conceived for the expansion of current oil production at Salman and exploitation of the gas and condensate reservoir located at Dalan complex. When the project is implemented the entire facility must be capable of increasing the oil production by 50,000 BOD and producing and transporting 540 MMSCFD of export quality gas to an onshore Gas Refinery Plant in Assaluyeh.
The project is to be implemented by the following three EPC Packages:
- EPC 1 : Wellhead Platform Jackets;
- EPC 2 : New Platforms and bridges (excluding the wellhead platform jackets), inclusive of wellhead platform topsides;
- EPC 3 : New Pipelines and Submarine Cables
Salman Oil and Gas Integrated Development Project
Salman submarine cables and submarine pipelines (EPC-3)
| Scope of services: |
Engineering, Procurement, Fabrication, Installation and Commissioning (EPC) |
| Client: |
Petroiran Development Company(PEDCO) |
| Location: |
Salman field in Persian Gulf (144 km south of Lavan Island) |
| Length of pipelines: |
310 km |
| Length of cables: |
16 km |
| Water depth: |
20-44.5 m, increasing to 80 m along the export pipeline route |
| Project duration: |
24 months |
| Commencement Date: |
March 2003 |
The consortium of Amid Engineering & Development Company and Iranian Offshore Engineering and Construction Company (IOEC) successfully won the Salman EPC-3 Tender. The project has been awarded on December 2002.
The consortium utilizes the services of international consultants, for Engineering and Procurement Services. The pipes will be coated in IOECs yard in Khoramshahr. The cables and pipes will be laid down by IOECs Marine spread and Marine spread of other international subcontractors. The pipes and cables will be tested and commissioned by the commissioning team of the consortium.
The scope of the contract is as follows:
1) Ten new lift gas pipelines (4 inch) from new Salman GLP to designated tripods to provide lift gas at 2200psi;
2) Eleven new oil gathering pipelines (10 and 8 inch ND) from existing designated tripods to New Riser Platform PP3 at Salman Complex;
3) Two new 20 inch gas gathering pipelines from new 2SKB and 2SKC Platforms to new KPP at the Dalan Complex designed to account for well shut-in pressure condition;
4) One 6 inch gas condensate pipeline from Dalan KPP to Riser Platform PP3 at Salman;
5) One 14 inch associated gas pipeline from existing Salman NGP to Dalan KPP;
6) One 36 inch Gas Flare pipeline with 2 inch piggy back pilot gas line from Dalan KPP to a Flare Platform FPP approximately 0.70 km South of KPP;
7) Three 6KV submarine power cable combined with fibre-optic cables, between Dalan KPP Platform and 2SK-B, 2SK-C and Salman GLP Platforms.
8) One 1KV submarine power cable for Gas Flare Pilot between Dalan KPP Platform and Flare Platform FPP.
9) 13 No.s of tripods structures inspection to define extent of modifications, stability check of tripods and installation of new piping manifolds and structural modifications if necessary.
10) Baisc Engineering & Survey of the new pipeline route from Salman gas fields to Sirri Island and from the Island to AP platform of Mobarak field of UAE.
11) Basic Engineering of Gas Compression Facilities at Sirri Island.
12) Detial Design of the GasCompression Facilities at Sirri Island.
Major Activities of the Salman EPC-3 Project consisted of:
- Engineering for structural refurbishment of existing tripod platform has been carried out at Engineering Department of Amid Engineering & Deveopment Co.
- Basic Design, Offshore Surveying, Inspection Surveying & Detail Design of the project was carried out by different international consultants under direct Supervision of Engineering Department of Amid Engineering & Development Co.
- All fabrication and work related to pipeline are being carried out in IOEC yard of Khoramshahr.
- The Installation of 30″ Export Gas Line are being carried out directly by IOEC.
Installation of infield gas line are being carried out by internatinal Contractor under direct Supervision of IOEC & Amid Consortium.
Salman Oil and Gas Integrated Development Project
New Platforms and Bridges (EPC-2)
| Scope of services: |
Engineering, Procurement, Fabrication, Transportation, Installation and Commissioning. (EPC) |
| Client: |
Petroiran Development Company(PEDCO) |
| Location: |
Salman field in Persian Gulf (144 km south of Lavan Island) |
| Water depth: |
20-44.5 m |
| Project duration: |
24 months |
| Total weight: |
15,000 MTons (Jackets, Piles, Topsides) |
| Contract value: |
200,000,000 USD |
The consortium of Amid Engineering & Development Company and Iranian Shipbuilding & Offshore Industries Complex Company (ISOICO) successfully won the Salman EPC-2 Tender.
The scope of the contract is as follows:
- GLP Platform for lift gas compression and distribution at Salman Complex complete with topsides, connecting bridge to NGP, ten lift gas and one associated gas preinstalled risers and one J Tube.
- GLP gas platform (Jacket, Piles, Topsides)
Total approx. weight: 2300 MTons
- Bridge from GLP to existing NGP platform
Total approx. weight:100 MTons
- PP3 Riser Manifold Platform at Salman Complex complete with topsides, connecting bridge to existing complex, one gas condensate and eleven oil gathering preinstalled risers.
- PP3 riser manifold platform (Jacket, Piles, Topsides)
Total approx. weight: 700 MTons
- Bridge from PP3 to existing NPP platform
Total approx. weight: 110 MTons
- KPP Gas Treatment Platform at Dalan Complex complete with topsides, connecting bridge to 2SK-A, export gas, associated gas, gas condensate and gas gathering preinstalled risers and three J Tubes.
- KPP gas treatment platform (Jacket, Piles, Topsides)
Total approx. weight: 8150 MTons
- Bridge from 2SKA to KPP platform
Total approx. weight: 50 MTons
- LQ3 at Dalan Complex complete with the topsides and connecting bridge to KPP.
- LQ3 accommodation platform (Jacket, Piles, Topsides) to provide accommodation for 60 men for the operation & maintenance personnel.
Total approx. weight: 2000 MTons
- Bridge from KPP to LQ3 platform
Total approx. weight: 100 MTons
- Wellhead Platform topsides for 2SK-B and 2SK-C and modification of 2SK-A.
- Wellhead platform topsides for 2SKB and 2SKC
Total approx. weight: 1800 MTons
- FPP new flare platform complete with a piled jacket and flare tower to meet the flaring requirements of KPP.
- FPP new flare platform (Jacket, Piles, Topsides)
Total approx. weight: 422 MTons |