South pars gas field development project - Phase 2 & 3
Service Contract for Preparation of the
SUBCONTRACT for
Construction of WP2 Deck and Ancillary Structures
* * *
The South
Pars Gas Field is located in the Persian Gulf at 100 km off Iranian
Southern Coast. TOTAL SOUTH PARS is the operator for design,
fabrication, installation, commissioning and start up of the
offshore and onshore facilities of the second and third phases of
the field development program which will allow gas production of 2 bn cubic feet per day. In this
project an EPSCC Contract was awarded to National Petroleum
Construction Company (NPCC) to carry out the Detailed Engineering,
Procurement, Supply, Construction and Commissioning of offshore
platforms. In order to fulfill the Iranian regulations regarding
utilization of local technical capabilities in A/M Contract, the
Persian Gulf Shipbuilding Complex (PGSC) was assigned the job to
perform the onshore fabrication of WP2 deck and ancillary structures
as a Subcontractor in their Yard in Bandar Abbas. In order to
approach the job professionally, PGSC hired Amid Engineering and
Development Company (AMIDCO) to prepare the technical and commercial
proposal and carry out the subcontract negotiation and finalization.
AMIDCO prepared the technical
proposal containing the method statement, work schedule, description
of personnel and equipment, quality assurance quality/control plan
and safety plan. In this proposal detailed plans for performing
different stages of the work were prepared based on capabilities of
PGSC and other local fabricators. The work included structural and
piping prefabrication, structural fabrication and erection, piping
and equipment installation, onshore pre-commissioning/commissioning,
load out and sea fastening of different modules i.e. WP2 deck,
tripod jackets, bridges and relief platforms. The commercial
proposal included the lump sum price and its detailed breakdown into
several work packages.
AMIDCO also conducted intensive
contractual negotiations on behalf of PGSC and TOTAL SOUTH PARS
after exchange of a number of contractual, commercial and technical
clarification and explanations the draft of the Subcontract was
prepared and agreed upon with NPCC and submitted for approval and
signature to PGSC, NPCC , TOTAL SOUTH PARS and their ultimate client
National Iranian Oil Company (NIOC).
The services were performed by
AMIDCO on a fast track basis for a duration of three months from
March 1999 to June 1999. |