Sulfur Removal Project

 

Location: ILAM PETROCHEMICAL COMPLEX,ILAM-IRAN

Objective:Estabishment of a Sulfur Removal Unit on EPCC basis

            Client: ILAM PETROCHEMICAL CO

Project Duration : 18 Months

EPC Contractor:Joint Venture of AMID Co&IDIS  

                                               

                                                       ٭   ٭    ٭

ILAM PETROCHEMICAL COMPANY (ILPC) a wholly owned subsidiary of NATIONAL PETROCHEMICAL COMPANY (NPC) has awarded J.V of IDIS and Amid Engineering Co a contract  with the Scope of  detail engineering, procurement services, supply of EQUIPMENT, construction, erection, pre-commissioning, commissioning, start up and PERFORMANCE TEST RUN of the UNIT and training of OWNER personnel at reference Unites with the following capacity using a patented and/or un-patented up to date technologies owned by Axens-France:

PRODUCT  CAPACITY:

C3+ 41.4 TON/hr

C5+ 49.4 TON/hr

(ILPC)   wishes to build a complete Liquid Sulphur Removal Unit- included C3+ and C5+ in order to prepare feedstock of the Olefin plant.

The unit will be located adjacent to ILAM GAS REFINARY which is about 10 Km far away from ILPC Complex.

 

Amid Engineering brief scope of WORK shall include the following:

1. Performance of Basic design and engineering.

2. Performance of detailed design and engineering.

3. Procurement and supply of all equipments and materials.

4. Construction, Erection and pre commissioning.

5. Performing Commissioning, Start-up and Performance test (s).

6. Training of (ILPC) personnel.

*  *  *