Sulfur Removal Project
Location:
ILAM
PETROCHEMICAL COMPLEX,ILAM-IRAN
Objective:Estabishment
of a Sulfur Removal Unit on EPCC basis
Client: ILAM
PETROCHEMICAL CO
Project
Duration : 18 Months
EPC
Contractor:Joint Venture of AMID Co&IDIS
٭ ٭ ٭
ILAM PETROCHEMICAL COMPANY (ILPC) a wholly owned
subsidiary of NATIONAL PETROCHEMICAL COMPANY (NPC) has awarded J.V of IDIS and
Amid Engineering Co a contract with the
Scope of detail engineering,
procurement services, supply of EQUIPMENT, construction, erection,
pre-commissioning, commissioning, start up and PERFORMANCE TEST RUN of the UNIT
and training of OWNER personnel at reference Unites
with the following capacity using a patented and/or un-patented up to date
technologies owned by Axens-France:
PRODUCT CAPACITY:
C3+ 41.4 TON/hr
C5+ 49.4 TON/hr
(ILPC) wishes to build a complete Liquid
The unit will be located adjacent to ILAM GAS REFINARY
which is about 10 Km far away from ILPC Complex.
Amid Engineering brief scope of WORK shall include the
following:
1. Performance of Basic design and engineering.
2. Performance of detailed design and engineering.
3. Procurement and supply of all equipments and materials.
4. Construction, Erection and pre commissioning.
5. Performing Commissioning, Start-up and Performance
test (s).
6. Training of (ILPC) personnel.
*
* *